What happened this week in the field.

Phase 2 Update:

  • Well 1 – Sales
  • Well 2 – Sales
  • Well 3 – Waiting to frack.
  • Well 4 – Flow back complete. Adding flow lines and oil tanks then put into sales.
  • Well 5 – Finishing up the lateral drilling.

Phase 3 Update:

  • Well 1 – Waiting to frack.
  • Well 2 – Fracked. We shut in the well to let the frack fluids settle in the formation. We follow up with a flow back of the frack fluids for 2-3 weeks. Then we put the well in sales.
  • Well 3 – Figuring out the frack recipe.
  • Well 4 – Prepping site.

We will be out at the field on Wednesday of next week if you would like to meet us out at the field.